Joined
·
32 Posts
So i've had this bike for about 6 months now and it is pretty much a different bike now.

mod list is as follows:
aftermarket gearing 16 tooth front and 43 tooth rear
a ScottOiler automatic chain oiler system to keep the chain in perfect condition.
Sargeant's Seat
Akrapovic full exhaust
GI-Pro gear indicator and speedohealer
Ivan's full performance package (install currently in progress)
CRG racing Clutch and break levers
SATO racing rear sets
R&G racing engine covers
2 line custom SS brake lines for front and 1 line custom SS line for rear with Motul RBF 600 brake fluid.
Vinyl Wrap is a self installed custom job. Currently redoing it while all the fairings are off...going to a new color scheme.
There is also quite a bit other small things from grips, bar ends and such but not worth mentioning too much.
lots of other things in the work as well..just waiting on the rest of the brake stuff to come in, including upgrading to 310mm rotors.

Here is the vinyl wrap in progress...took about 27 hours to do in the garage.


And here is how the bike currently looks while i wait for all the Ivan stuff to come in.




Some other side notes..while i'm this far apart i'm doing a bunch of normal maintenance stuff, like doing as much of the coolant flush as i can do...I'll do the flush the correct way once i get the bike back together.
Also de-greasing everything and giving the bike a super cleaning.

mod list is as follows:
aftermarket gearing 16 tooth front and 43 tooth rear
a ScottOiler automatic chain oiler system to keep the chain in perfect condition.
Sargeant's Seat
Akrapovic full exhaust
GI-Pro gear indicator and speedohealer
Ivan's full performance package (install currently in progress)
CRG racing Clutch and break levers
SATO racing rear sets
R&G racing engine covers
2 line custom SS brake lines for front and 1 line custom SS line for rear with Motul RBF 600 brake fluid.
Vinyl Wrap is a self installed custom job. Currently redoing it while all the fairings are off...going to a new color scheme.
There is also quite a bit other small things from grips, bar ends and such but not worth mentioning too much.
lots of other things in the work as well..just waiting on the rest of the brake stuff to come in, including upgrading to 310mm rotors.

Here is the vinyl wrap in progress...took about 27 hours to do in the garage.


And here is how the bike currently looks while i wait for all the Ivan stuff to come in.




Some other side notes..while i'm this far apart i'm doing a bunch of normal maintenance stuff, like doing as much of the coolant flush as i can do...I'll do the flush the correct way once i get the bike back together.
Also de-greasing everything and giving the bike a super cleaning.